Write-up

Moraine State Park (Lake Arthur) Bike Trail
Line Name   surface  routes  total miles  gap  off_road  on_road  closed  unknown  other   
map Extension  Trail Closed  moraine  0.1305        0.1305        
map Trail along Dam  Trail Open Surface Unspecified  moraine  0.9669    0.9669            
map through Bicycle Rental Parking Lot  Road Low Volume Asphalt  moraine  0.082      0.0820          
map North Shore Start Bicycle Rental  Trail Open Surface Unspecified  moraine  1.7461    1.7461            
map Lakeview North then east  Trail Open Surface Unspecified  moraine  1.1477    1.1477            
map Lakeview North  Trail Open Surface Unspecified  moraine  0.9153    0.9153            
map Barber Point_1  Trail Open Surface Unspecified  moraine  0.9513    0.9513            
map Barber Point_2  Trail Open Surface Unspecified  moraine  0.1485    0.1485            
map Worth Point west  Trail Open Surface Unspecified  moraine  1.1527    1.1527            
map Davis Marina west  Trail Open Surface Unspecified  moraine  1.042    1.0420            
           
Moraine State Park (Lake Arthur) Bike Trail  total for Trail    8.283    8.0705  0.082  0.1305        
           

Trail Lines are typically entered by tracing satellite imagery to extract latitude/longitude coordinates. The accuracy of these coordinates changes depending on the source of the photo and the precision of placement. I have seem satellite edges mismatched on the order 55 feet. Line work is sometimes extracted from the Open Street Map Project and from Strava heat maps.
>Milepost Known milepost (are placed on the map when they are visible in the satellite image or can be located via to visible features in the image. Other miles posts are extrapolated using calculations along the rail line. Note Railroads have also been known to realign trackage and not move existing mileage markers, only making an annotation on their paper maps.
Distances Above are based on the google map distance between two points along the line work.