Write-up

McClintock Trail
Line Name   surface  routes  total miles  gap  off_road  on_road  closed  unknown  other   
map Coal Johny House to McClintock Well #1  Road Low Volume Gravel  mcclintock,e2p,,epta-free,epta-ken, all2tid,  1.6522      1.6522          
map McClintock Well #1 to Oil City Launch  Trail Open Asphalt  mcclintock,e2p,,epta-free,epta-ken, all2tid,  1.4236    1.4236            
map Oil City Launch to bridge  Trail Open Asphalt  mcclintock,e2p,,epta-free,epta-ken, all2tid,  0.0764    0.0764            
map across the bridge  trail Open Wood  mcclintock,e2p,,epta-free,epta-ken, all2tid,  0.0621    0.0621            
map bridge to Seneca St  Trail Open Asphalt  mcclintock,e2p,,epta-free,epta-ken, all2tid,  0.2007    0.2007            
           
McClintock Trail  total for Trail    3.415    1.7628  1.6522          
           

Trail Lines are typically entered by tracing satellite imagery to extract latitude/longitude coordinates. The accuracy of these coordinates changes depending on the source of the photo and the precision of placement. I have seem satellite edges mismatched on the order 55 feet. Line work is sometimes extracted from the Open Street Map Project and from Strava heat maps.
>Milepost Known milepost (are placed on the map when they are visible in the satellite image or can be located via to visible features in the image. Other miles posts are extrapolated using calculations along the rail line. Note Railroads have also been known to realign trackage and not move existing mileage markers, only making an annotation on their paper maps.
Distances Above are based on the google map distance between two points along the line work.